Pricing
Published starting rates for every service, so you know the floor before you ask. Your written quote confirms the real number before any work begins.
TPC-P1 // Service pricing
Starting rates by service
01 · Drafting
Electrical CAD & Panel Drawings
estimated starting rate
Typical starter scope
- Small drawing package, e.g. up to 5 schematic sheets, or one panel layout with BOM
- Drawn on your title block and symbol library
- One revision round included
02 · Logic
PLC Programming & Logic Architecture
estimated starting rate
Typical starter scope
- Single machine or cell on one controller, roughly up to 64 I/O
- Modular structure, state machine and fault handling
- One revision round plus FAT test sheet
03 · Operator
HMI Screen Development
estimated starting rate
Typical starter scope
- Up to about 8 screens on a single operator panel
- Overview, alarm and diagnostics screens included
- Built on your existing PLC tag database
04 · Data
SCADA & IIoT Integration
estimated starting rate
Typical starter scope
- One site, one connectivity stack (OPC UA or MQTT)
- Roughly up to 250 tags with SQL logging
- One dashboard or report template
05 · Process
DCS & Process Control
estimated starting rate
Typical starter scope
- A small set of control modules or loops, or one batch phase
- Matching graphics and faceplate updates
- Configuration notes for your MOC package
06 · Startup
Remote Commissioning, FAT & Troubleshooting
estimated starting rate
Typical starter scope
- One 4-hour remote session, scheduled in advance
- Code review, fault isolation or FAT verification
- Written session notes; extra time at $110/hr
TPC-P2 // Hourly & block options
Prefer to pay for time?
Hourly work suits open-ended tasks: redline cleanup, code reviews, troubleshooting and support while your own team leads the project. Time is logged in 15-minute increments against your PO or block balance.
Electrical drafting
Schematics, panel layouts, redlines and as-builts
$75 /hr
PLC engineering
Logic changes, code reviews and structured rework
$85 /hr
Remote commissioning & troubleshooting
Live sessions, fault isolation and startup support
$110 /hr
Half-day remote block
4 hours, pre-paid, scheduled in advance
$350 /block
HMI, SCADA & DCS engineering
Quoted per scope; hourly rate stated on your quote
per quote
All rates are estimated starting rates in USD. Expedited timelines, on-site work and travel are quoted separately.
TPC-P3 // Scope variables
What moves the final quote
Starting rates cover a typical small scope. These are the factors that move a quote up or down, and the ones we ask about first.
I/O count & device count
More points mean more drawings, more logic, more screens and more checkout. It is the single biggest driver of effort.
Platform & software
Controller family, software versions and licensing. Clients supply licenses for their target platform; specialized toolsets can affect rate.
Revision rounds
Each quote states the included rounds. Additional rounds, or changes after approval, are handled through a written change order.
On-site & FAT attendance
Remote work is the default. FAT attendance, site commissioning and travel are scoped and priced separately.
Documentation standard
Customer-specific standards, validation documentation or regulated-industry deliverables add review and formatting time.
Timeline & starting point
Expedited delivery, and modifying undocumented existing code instead of starting clean, both change the estimate.
TPC-P4 // Billing FAQ
Billing, deposits & revisions
The short version: written scope first, deposit to start, milestones after that, and completed engineering hours are billable. The Refund & Scope Policy has the full detail.
How do I get a firm price?
Send a brief through the quote form. We review your inputs, ask scope questions where needed, and send a written quote listing deliverables, assumptions, included revision rounds, schedule and price. Nothing is billed until you accept it.
Do you require a deposit?
Yes. Fixed-scope projects start with a deposit stated on your quote. The remaining balance is invoiced at agreed milestones, typically on delivery of drawings or code for review and on final handover. Starter blocks are paid in full up front.
What counts as a revision round?
One consolidated set of comments on a delivered issue, within the agreed scope. Corrections of our own errors are always free. New requirements, changed I/O, or a different platform are scope changes, not revisions.
What happens if the scope changes mid-project?
We pause the affected work and send a written change order with the added effort and cost. Work on the change starts only after you approve it, so there are no surprise invoices.
Who provides software licenses?
You supply licenses for the target platform, or remote access to a licensed engineering workstation. We keep our own development tools current, but project files are created and delivered for your licensed environment.
How do I pay?
Starter blocks, deposits and invoices can be paid on the Payments page through secure card checkout once our processor is connected. Purchase orders and bank transfers can be arranged for larger projects; ask on your quote.
Are completed hours refundable?
Completed engineering hours and accepted milestones are non-refundable. Unused, unstarted portions of a deposit or block can be refunded or credited as described in the Refund & Scope Policy.
Will you sign an NDA?
Yes. Many projects start with a mutual NDA, and you can request one in the quote form before sharing drawings or code.
Next step
Get a number you can put in your bid.
Send the scope. You will get a written quote with deliverables, assumptions and price.