Capabilities & Sample Work
The standards behind every deliverable, from field tag to dashboard. Everything on this page is a reference or sample built to show how we work. Client projects stay confidential.
TPC-C1 // Architecture stack
One tag model, five layers
Select a layer to see the standard we apply there. The same tag name travels from the field device to the report, which is why our drawings, code and screens agree.
L4
Reporting & enterprise
Dashboards · OEE · MES/ERP feeds
L3
Data & historian
SQL · MQTT · OPC UA
L2
Supervisory
HMI · SCADA · Alarming
L1
Control
PLC · DCS · Safety interface
L0
Field devices & I/O
Instruments · Drawings · Terminals
Level 4 · Reporting
Reports people actually open
Reports are built from the historian, never from screen scraping, so numbers match between shifts, sites and the ERP.
- KPIs defined in writing before a single query is built
- Shift, production and downtime reports with drill-down
- Read-only service accounts for enterprise integrations
Sample excerpt
-- Shift OEE roll-up (sample)
SELECT line_id,
shift_start,
SUM(good_count) / NULLIF(SUM(total_count), 0) AS quality,
SUM(run_sec) / NULLIF(SUM(planned_sec), 0) AS availability
FROM prod.shift_counts
WHERE shift_start >= @from
GROUP BY line_id, shift_start; Level 3 · Data
Structured data, not a tag dump
Data leaves the controller through a defined namespace and lands in a schema designed for the questions you will ask of it.
- Unified namespace: site / area / line / equipment / signal
- Deadband and logging-rate rules per signal class
- Store-and-forward at the edge so outages don't create gaps
Sample excerpt
# Namespace (sample)
site01/packaging/line02/filler/state "RUNNING"
site01/packaging/line02/filler/rate_bpm 412
site01/packaging/line02/filler/alarm {"code":"F104","pri":2}
CREATE TABLE hist.analog (
tag_id INT NOT NULL,
ts DATETIME2 NOT NULL,
value REAL,
quality SMALLINT,
PRIMARY KEY (tag_id, ts)
); Level 2 · Supervisory
Calm screens, honest alarms
HMI and SCADA screens follow high-performance principles: grey-scale by default, color only for abnormal states, and every alarm has a priority, a cause and an expected operator action.
- Overview → area → detail navigation, three clicks maximum
- Faceplates generated from the same UDTs as the PLC code
- Alarm rationalization table delivered with every project
Sample excerpt
Alarm classes (sample) P1 Safety / critical red audible ack + reason P2 Process upset amber audible ack P3 Advisory blue silent ack P4 Maintenance grey silent auto-clear Rule: grey-scale by default; color = abnormal only
Level 1 · Control
Modular code with a state model
Every device type gets a data type and a reusable block with the same command, status, configuration, alarm and diagnostic structure. Sequences run as explicit state machines, so “why is it stuck?” has an answer on screen.
- One UDT / function block per device class, reused everywhere
- Explicit states and transitions, never scattered latches
- First-out fault capture and a single reset path
Sample excerpt
// UDT_Motor (sample structure) UDT_Motor ├─ Cmd Start, Stop, Reset, Mode (AUTO | MAN) ├─ Sts Running, Faulted, Available, Interlocked ├─ Cfg StartDelay_ms, FeedbackTimeout_ms ├─ Alm FailToStart, FailToStop, Overload └─ Diag RunHours, Starts, LastFaultCode // States: IDLE → STARTING → RUNNING → STOPPING → FAULTED
Level 0 · Field
Tags, wires and terminals that agree
The I/O list is the single source of truth. Schematics, terminal plans, PLC tags and HMI labels are all generated from it, so a wire number on the drawing leads straight to the tag in the code.
- Instrument tags based on ISA-5.1 function letters
- Wire and terminal numbers derived from the device tag
- Cross-references on every sheet: coil to contact, page to page
Sample excerpt
Tag format (sample, ISA-5.1 based) FIT-1203 Flow indicating transmitter · area 12 · loop 03 LSHH-2201 Level switch high-high · area 22 · loop 01 XV-1410 On/off valve · area 14 · loop 10 Wire 1203-FIT-01+ Terminal X12:31 PLC AI_1203_FIT
TPC-C2 // Standards
Three standards we never skip
Modular code
Reusable device blocks, a documented state model and consistent naming, so the tenth machine is faster than the first.
- Library of device UDTs, AOIs and FBs
- Program organized by area and equipment
- Comments describe intent, not syntax
- Version history with a change log
Structured I/O & drawings
The I/O list drives everything downstream. Drawings and code are generated from the same source and checked against each other.
- I/O list as the single source of truth
- Tag, wire and terminal numbers aligned
- Full cross-referencing on every sheet
- Revision clouds and a revision table on each issue
SCADA → SQL pipelines
Data that arrives clean, timestamped and queryable, designed with your IT team rather than around them.
- Namespace and schema agreed up front
- Logging rates set per signal class
- Store-and-forward at the edge
- Least-privilege accounts and documented ports
TPC-C3 // Reference drawings
Drawing formats we deliver
Reference drawings showing sheet types and drafting conventions. They are format samples, not client work. Select any drawing to enlarge it.
TPC-C4 // Reference architectures
How we would structure it
Illustrative architectures for common project types. These are design patterns, not descriptions of client systems.
RA-01 · Illustrative · not a client project
Packaging cell
Control
1 PLC, 3 VFDs on EtherNet/IP
Operator
12" HMI, 9 screens
Data
OEE counts to SQL
PackML-style state model, device UDT library, and shift reports built from the same counters the HMI displays.
RA-02 · Illustrative · not a client project
Batch process skid
Control
ISA-88 phases & recipes
Loops
Temperature cascade, flow ratio
Data
Batch records to historian
Equipment and control modules separated from recipe procedure, so new products need recipe changes, not code changes.
RA-03 · Illustrative · not a client project
Multi-site monitoring
Edge
Gateways with store-and-forward
Transport
MQTT Sparkplug B
Central
SCADA, SQL, dashboards
One namespace across sites, templated screens per asset type, and alarm routing by site and priority.
Next step
Want these standards on your project?
We can work to your existing standard or deliver ours as a starting template.





